
Setup
- Large furniture is moved into the center of the room.
- Wall and ceiling fixture are removed.
- Floors are covered with drop cloths.
- Walls are sanded and scuffed.
- Any damages, such as holes are caulked with only the finest materials
- Painting is completed only using the finest paints available
- Repaired areas are primed.
- Furniture is moved back to original positions.
- Wall and ceiling fixtures are replaced.
- Floors and carpets are thoroughly vacuumed and swept.
- All garbage is removed.